Oil Installation Installed in Hereford
Installation of a Worcester Greenstar Heatslave II 18/25 ERP combination boiler. Removing an old Worcester Danesmoor which had become beyond economic repair.
Installation of a Worcester Greenstar Heatslave II 18/25 ERP combination boiler. Removing an old Worcester Danesmoor which had become beyond economic repair.
Installing a new Worcester Greenstar 30i ERP Combination boiler taking out a old inefficent back boiler which had been condemned in a recent service call.
Replaced a combination boiler which was loosing pressure all the time due to expansion vessel which had corroded and which was beyond ecomic repair. The landlord contacted us and we
We replaced a broken down external boiler which looked tired and beyond repair with a new External Worcester Bosch Greenstar Heatslave II
Natural gas boiler installation taking out existing and replacing with new Worcester Bosch 30i erp Kind regards, Richard Richard Meade | Managing Director Meade Heating Limited 55 Coventry Road, Burbage,
We took out a old oil boiler and replaced it with a new Worcester Bosch Danesmoor utility 35/50 Greenstar regular boiler. Please browse through the before and after pictures. Kind
Mrs Farrington as asked us to replace her old inefficient boiler as it isn’t working correctly so we replaced her existing boiler with a new Worcester Greenstar heatslave II 18/25
Worcester Greenstar Danesmoor Utility 18/25 Oil Boiler The removal of a Trianco Tro Eurostar 60/70 this oil boiler was inefficient and needed a new boiler stat, a new more efficient
This internal LPG boiler with an external storage tank was installed and commission by us at the end of 2016. Worcester Greenstar Danesmoor External 12/18 ErP A condensing
This internal natural boiler was installed and commission by us at the end of 2016. Worcester Greenstar Danesmoor External 12/18 ErP A condensing Heating Boiler EN 15034 –