Installation of a upgrade of a central heating system in Telford

May. 18, 2017 by

Installing a new Worcester Greenstar 30i ERP Combination boiler taking out a old inefficent back boiler which had been condemned in a recent service call.

Natural gas boiler in Lutterworth

May. 9, 2017 by

Replaced a combination boiler which was loosing pressure all the time due to expansion vessel which had corroded and which was beyond ecomic repair. The landlord contacted us and we

Installation of a combination boiler in Hinckley

May. 4, 2017 by

Natural gas boiler installation taking out existing and replacing with new Worcester Bosch 30i erp Kind regards, Richard Richard Meade | Managing Director Meade Heating Limited 55 Coventry Road, Burbage,

2017 February – Leeds – Lee Fair Court Leeds

Feb. 22, 2017 by

Emergency Call Out – Gas Boiler Swap We were called by the customer to respond to this emergency.  The old boiler had broken down and was long over due being

2016 October | Internal Natural Gas Boiler Swap

Oct. 11, 2016 by

This internal natural boiler was installed and commission by us at the end of 2016.           Worcester Greenstar Danesmoor External  12/18 ErP A condensing Heating Boiler EN 15034 –